PROJECTS

retaining walls_narangba
retaining walls_narangba

Lilly_Anna
Lilly_Anna

BAR Civil
BAR Civil

retaining walls_narangba
retaining walls_narangba

1/5

14 Lot Residential Sub Division

Lilly Anna Lane, Narangba,

Description of Works:

Initial site clearing then undertaking all earthworks including sewer reticulation, water main pipework and connection, roads and construction of 500 sqm of retaining walls of various construction type. Construction of retention basin and concrete driveways. Each residential lot is benched level on 10% gradient. Project completed October 2017.

Elimbah_Acreage
Elimbah_Acreage

Elimbah_Acreage
Elimbah_Acreage

1/1

5 Lot Rural Residential Sub Division

Boden Road, Elimbah

Description of Works:

Initial site clearing then undertaking all earthworks including filling small dam to Level 1 compaction; road construction with kerb & channel; stormwater drainage; bitumen driveways; installation of town water infrastructure and the co-ordination of underground electrical reticulation & MBN. Project completed April 2017.

Carina_finished
Carina_finished

Forest Edge
Forest Edge

Sewer Reticulation
Sewer Reticulation

Carina_finished
Carina_finished

1/8

13 Lot Residential Sub Division

Forest Edge, Carina Heights South Brisbane

Description of Works:

Initial site clearing then undertaking all earthworks including sewer reticulation, water main pipework and connection, power, roads and construction of 16 retaining walls of various construction type. Each residential lot is benched level on 12% gradient. Project completed February 2017.

 

Bracken Ridge
Bracken Ridge

1 into 3 sub division
1 into 3 sub division

Pipe infrastructure
Pipe infrastructure

Bracken Ridge
Bracken Ridge

1/6

One into Three Residential Sub Division

Quinlan Street, Bracken Ridge South Brisbane

Description of Works:

Undertaking all earthworks including installation of sewer, water and storm water pipes, concrete footpaths and driveways. Final landscaping ready for council sealing.

 

Spring Ridge Estate
Spring Ridge Estate

Rural Residential subdivision
Rural Residential subdivision

bio retention basin
bio retention basin

Spring Ridge Estate
Spring Ridge Estate

1/4

9 Lot Rural Residential Sub Division

Spring Ridge Estate, Caboolture 

Description of Works:

Initial site clearing and all earthworks including roads, storm water drainage, watermain pipe infrastructure, bio retention basin, landscaping and revegetation and connecting existing dwelling to all infrastructure.

 

tree clearance
tree clearance

earthworks
earthworks

tree clearance
tree clearance

1/2

250 metre Bitumen Driveway

Private residence, Willow Vale

Description of Works:

Construction of 250 metre bitumen driveway including intial site clearance, earthworks, drainage (including large culvert) laying conduits and construction of 1200 cubic metre capacity dam.

 

1/4

Description of Works:

Construction of a 56 car space carpark. 2000SqM area included extensive unsuitable material removal, large agricultural drainage line system to collect and remove underground spring water, asphalt surfacing, construction of A Grade boulder rock retaining wall, landscaping including an artificial turf outdoor alfresco lounge area.

 

Carpark Construction & Landscaping

Sandgate Australian Football Club, 120 Lemke Road Taigum

1/6

6 lot rural residential sub division

370 Old Gympie Road, Caboolture

Description of works:

Mucking out and filling existing dams with 4000 Cu.M. of fill under Level 1 compaction requirements; 600 metres of kerb and channelled, asphalt seal full road construction; drainage system including overland swale collection drains to underground stormwater pipe system outletting to complex bio-retention and slow release basins; installation of town water infrastructure and the co-ordination of the underground electrical reticulation.

 

1/5

Description of works:

Construction of a 300 metre 2 coat seal road on the side of a mountain at a grade of 1 in 4 (25%). Some unique techniques and designs were needed to allow for the heavy rainfall and large quantity runoffs.

Road construction 

Skermans Lane, Booroobin (via Maleny)

1/5

Description of works:

Widening and upgrade of Farry Road to a collector road standard of kerb and channel; relocation of the water reticulation; stormwater drainage installation including gully pits, manholes, swale drains, field inlet pits and pipes, construction of bio-retention basin with controlled slow release.

6 lot rural residential sub division  

291 Uhlmann Road, Burpengary

1/3

Description of works:

300 metres of half road construction with kerb and channel and asphalt finish; water reticulation installation; earthworks including level 1 dam filling and minor cut to fill works.

5 lot rural residential sub division  

67 Rangeview Road, Morayfield

1/4

Description of works:

Clearing of densely timbered block; mucking out and filling of large dam to level 1 compaction; full road construction with kerb and channel; water and sewer reticulation installed, drainage network construction including large overland flow channel with complex drop structures; various retaining walls including concrete block, timber railway sleeper and boulder rock walls.

11 lot residential sub division   

Hackett Court, off Grant Road, Caboolture

1/7

Description of works:

Extensive earthworks of 30,000 Cu.m. cut to fill on the side of a 1 in 6 hill where every house block was cut level; mucking out and level 1 filling of 3 very large dams;  construction of 1600 Sq.m. of boulder rock & timber railway retaining walls; 900 metres of internal full road construction and the upgrading of the major feeder road that included 2000 Cu.m. fill. All infrastructure installed including sewer (52 manholes), water; drainage construction included large network of piping and inlets feeding into 3 large retention basins with gabion spillways and slow release mechanisms.

67 lot residential sub-division  

North Park Estate, Cnr Ann Street & Thompson Road, Kallangur

 

0412 391 554
 

Call us now